Step 8

The Engine Work Platform is lifted to the loading platform and rolled into place to allow engineers to prepare the engine for test. The Engine Work Platform and Engine Vertical Installer are then removed and the loading platform is returned to its fully extended position.

Engine Work Platform placed around F-1 rocket engine in F-1 Test
	Stand

Photo Credit HABS/HAER via Marshall Space Flight Center
Extraction and adaptation by heroicrelics
Full-size Image Click here for a 3157x2725 pixel version of this diagram in a new window.