Step 6
The vertical installer raises the engine. Engineers then attach the engine's Gimbal Assembly Block to the thrust measurement system, and attach the test stand's two actuator arms to the engine frame, securing the engine to the test stand at three points.
Photo Credit | HABS/HAER via
Marshall Space Flight Center Extraction and adaptation by heroicrelics |
Full-size Image | Click here for a 3157x2725 pixel version of this diagram in a new window. |