| ||||
dsc01563.jpg | ||||
The stage's systems tunnel. Anything which needed to go from the forward to the aft end of the stage (or vice versa) was routed through this tunnel, including electrical connections and the gaseous hydrogen line used for tank pressurization. | ||||
|
||||
|