Prev heroicrelics.org
Science Museum Oklahoma (formerly the Omniplex) Site Index
J-2 Engine Gallery
Next

dsc46201.jpg

Overall walk-around of the "customer connect fluid system," the pneumatic interface to the stage. These lines include fuel and oxidizer tank pressurization lines; start tank fill, drain, vent, and relief lines; turbopump and thrust chamber jacket purges; and a helium tank fill line.

Picture 3 of 3.

The red framework and line plate appear to be ground support equipment, as nothing similar appears on the S-II stage.

 
J-2 Engine customer connect fluid system (pneumatic interface to S-II or S-IVB stage) at Science Museum Oklahoma (formerly the Omniplex)
Time picture taken Wed Jul 30 15:38:20 2008
Location picture taken Open-Air Exhibit Gallery
Science Museum Oklahoma (formerly the Omniplex)
Oklahoma City, OK
Prev J-2 Engine Gallery Next