Overall walk-around of the subgrade level of the test stand (below the
single-story portion of the stand as seen at far right in this photo). The
subgrade level housed the electrical equipment room, the mechanical equipment
room, and the termination room. The equipment delivery and removal pit was
accessible from the mechanical equipment room. Refer to the "Floor Plans -
Foundation Plan at Bedrock and Subgrade Level Plan" at the HABS/HAER survey
of the F-1 Engine Static Test Stand.
Photo 2 of 4.
This photo was taken at the north corner of the remains, looking at the west
wall.
|