| ||||||
dmg_1802.jpg | ||||||
|
Bolts have been installed in the holes in the concrete slab and the throat support has been moved back into position for the installation of the nuts. Picture 1 of 2. The gap between the concrete slab and the base of the throat support will be filled in with concrete prior to the engine's installation. | ||||||
| ||||||
|
||||||
|