| ||||||
dmg_1525.jpg | ||||||
|
Relocating the J-2 engine within its garage bay. Picture 2 of 2. It is unclear what, exactly, was being done to the engine. It was still (or again) in the same bay on March 6, when it was relocated outside in preparation for its fit test two and a half weeks later. | ||||||
| ||||||
|
||||||
|