| ||||
dsc01561.jpg | ||||
View of the inside of the forward skirt. Picture 6 of 6. As this is the dynamic test stage, the forward thermoconditioning panels used to cool the electrical boxes installed in the forward skirt were not installed, but rather these identical-size dummy mass panels. The small-diameter line at left would appear to be the hydrogen tank pressurization line. The larger-diameter line at left is the hydrogen tank vent line (which leads to the umbilical on the forward skirt). | ||||
|
||||
|