| ||||
dsc00280.jpg | ||||
View of the inside of the forward skirt. Picture 4 of 6. As this is the dynamic test stage, the forward thermoconditioning panels used to cool the electrical boxes installed in the forward skirt were not installed, but rather these identical-size dummy mass panels. The line going to the tank bulkhead would appear to be the hydrogen tank pressurization line. | ||||
|
||||
|