| ||||
dscb0127.jpg | ||||
Part of the S-II stage's thrust structure, with the silver LOX fill/drain line at the 8:00 position. This duct leads from the LOX fill/drain fitting on the aft skirt (where it attaches to one of the launch/umbilical tower's swing arms) to the LOX sump. | ||||
|
||||
|