| ||||
dsc39201.jpg | ||||
The S-IC's support posts, bolted to the concrete pads in the gravel floor. Later, when the concrete floor for the rest of the building would be poured, these concrete pads and the bolts fixing the supports to them would be covered over. | ||||
|
||||
|