| ||||
dsca9906.jpg | ||||
View of the blower facility and the "elbow" piece of ducting, formerly attached to the building's north (left) side, now located to the building's south. This relocation was done sometime between my July 2012 and September 2013 visits. This photo was taken from the top of the S-IC Test Stand. | ||||
|
||||
|