3-18-09-056.jpg

Inside one of the valve rooms.

Four valves on each side of the flame deflector controlled the supply of water into the flame deflector. For additional information, see the HABS/HAER Flame Deflector Water Supply Flow Diagram.

Picture 2 of 2.

See here for the other set of valves.

F-1 Test Stand Interior Gallery 3-18-09-056.jpg

Time picture taken Wed Mar 18 09:21:01 2009
Location picture taken F-1 Test Stand Interior
West Test Area
Marshall Space Flight Center
Huntsville, Alabama
Photo Credit Marshall Space Flight Center
Full-size Image Click here for a 1029x684 pixel version of this diagram in a new window.