| ||||
dsc99956.jpg | ||||
Overall walk-around of the aft unit and warhead section. Picture 3 of 4. While the aft unit and warhead section are fastened together throughout the entire launch and flight phase, the warhead section proper extends to the line of rivets to the right of the right-most support post (the red marking is just aft of the ball fitting access door). The gallery in which this is displayed is too small to get the entire missile body in a single frame. | ||||
|
||||
|