Prev heroicrelics.org
Air Zoo Site Index
Redstone Tail Unit Gallery
Next

dsc89840.jpg

Overall sweep of the floor of the interior of the tail unit.

Picture 7 of 8.

Note the LOX replenish coupling on the tail unit wall and the hydrogen peroxide overflow/vent port and the steam vent on the floor of tail unit.

 
Interior of Redstone Tail Unit, including multiple pneumatic coupling balcony fittings, air rudder/jet vane actuators, electrical connection box, hydrogen peroxide overflow and vent port, steam vent, and LOX replenish coupling at Air Zoo
Time picture taken Mon Aug 5 10:15:40 2013
Location picture taken East Campus
Air Zoo
Portage, MI
Prev Redstone Tail Unit Gallery Next